{"id":4583,"date":"2024-07-16T12:49:50","date_gmt":"2024-07-16T15:49:50","guid":{"rendered":"https:\/\/eleadatacenters.com\/?p=4583"},"modified":"2024-10-18T17:13:20","modified_gmt":"2024-10-18T20:13:20","slug":"elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area","status":"publish","type":"post","link":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/","title":{"rendered":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area"},"content":{"rendered":"<p><em>The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.<\/em><\/p>\n<p>Elea Digital Data Centers, a leading provider of digital infrastructure and colocation services in Brazil\u2019s Tier 1 and Tier 2 markets, announced a 120MW, $1 billion strategic expansion plan to meet the booming demand for data centers.<\/p>\n<p>Elea\u2019s investment comprises the acquisition of two data center campuses in greater S\u00e3o Paulo and a massive footprint expansion of up to 100MW in the coming years. These facilities, located in S\u00e3o Bernardo do Campo (SPO2) and the Tambor\u00e9 region (SPO3), have a current combined power capacity exceeding 10MW. The S\u00e3o Bernardo do Campo site also includes a land bank and a high-voltage substation. The investment, approved by the Brazilian Antitrust Authority (CADE) and pending final confirmation, provides immediate availability for local and global customers in a metro area facing supply constraints, as major colocation projects are anticipated to become operational from 2025 onwards.<\/p>\n<p>According to Alessandro Lombardi, Chairman of Elea Digital Data Centers, Elea is adding significant capacity and depth to its portfolio in S\u00e3o Paulo, which currently represents 80% of the country\u2019s IT load demand. \u201cOne of the data centers Elea is acquiring is in the heart of the former Brazilian automotive cluster, S\u00e3o Bernardo do Campo, where gigawatts of available energy are readily accessible. I am excited to lead this initiative of starting a new data center cluster in S\u00e3o Paulo.\u201d<\/p>\n<p>Brazil represents one of the world\u2019s fastest-growing data center markets, driven by exponential demand from leading cloud, AI, and hyperscale operators. Responding to this skyrocketing demand, Elea strategically expands its portfolio through a hybrid approach, utilizing both existing infrastructure and new state-of-the-art sustainable construction.<\/p>\n<p>The two newly acquired assets in S\u00e3o Paulo are located in areas with advantageous subsea cable connectivity, aligning with Elea\u2019s focus on delivering high-performance IT infrastructure solutions. SPO2, in S\u00e3o Bernardo do Campo, is situated 18 miles away from downtown S\u00e3o Paulo, where Elea\u2019s operational site SPO1 is located. The Barueri facility (SPO2) is in the continent\u2019s most connected data center hub, adjacent to Equinix SP4, Scala Tambor\u00e9 Campus, ODATA, and Telefonica core sites.<\/p>\n<p>Once CADE\u2019s approval decision is final, Elea\u2019s platform footprint in Brazil will expand to nine data centers distributed across five different metros, making it the only colocation provider with as many facilities in the country. Elea\u2019s sites are powered by 100% renewable energy, providing critical digital infrastructure to meet evolving cloud, AI, and enterprise customer demands worldwide.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>About Elea Digital Data Centers<\/strong><\/p>\n<p>Headquartered in Rio de Janeiro, Brazil, Elea Digital Data Centers is Latin America\u2019s pioneering data center infrastructure platform on a mission to accelerate a responsible digital economy across the region and beyond. Powered by 100% renewable energy and supported by a leading North American-based financial institution in addition to local financial institutions, Elea operates a nationwide network of seven interconnected data center campuses in the most critical interconnected Tier 1 and Tier 2 cities of Brazil, with the capacity and scale to accommodate the high-density cloud and AI deployment needs of hyperscalers, and large global or local enterprises. Elea Digital is the world\u2019s bridgeway to Brazil, coupling local market expertise with high-performance solutions that ensure your business\u2019 successful entry into LATAM. For more information, visit <a href=\"http:\/\/www.eleadatacenters.com.\">www.eleadatacenters.com.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology. Elea Digital Data Centers, a leading provider of digital infrastructure and colocation services in Brazil\u2019s Tier 1 and Tier 2 markets, announced a 120MW, $1 billion strategic expansion plan to meet the booming demand for data centers. Elea\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4584,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[18],"tags":[],"class_list":["post-4583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases-3n"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea<\/title>\n<meta name=\"description\" content=\"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea\" \/>\n<meta property=\"og:description\" content=\"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/\" \/>\n<meta property=\"og:site_name\" content=\"Elea\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-16T15:49:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-18T20:13:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"512\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"\\\/#\\\/schema\\\/person\\\/62eb708a6729476fb3473b8d4cfdcedf\"},\"headline\":\"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area\",\"datePublished\":\"2024-07-16T15:49:50+00:00\",\"dateModified\":\"2024-10-18T20:13:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/\"},\"wordCount\":575,\"commentCount\":0,\"publisher\":{\"@id\":\"\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/IMAGEM-PARA-BLOG-1-768x512-1.png\",\"articleSection\":[\"Press Releases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/\",\"url\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/\",\"name\":\"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea\",\"isPartOf\":{\"@id\":\"\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/IMAGEM-PARA-BLOG-1-768x512-1.png\",\"datePublished\":\"2024-07-16T15:49:50+00:00\",\"dateModified\":\"2024-10-18T20:13:20+00:00\",\"description\":\"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/IMAGEM-PARA-BLOG-1-768x512-1.png\",\"contentUrl\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/IMAGEM-PARA-BLOG-1-768x512-1.png\",\"width\":768,\"height\":512},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/2024\\\/07\\\/16\\\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area\"}]},{\"@type\":\"WebSite\",\"@id\":\"\\\/#website\",\"url\":\"\\\/\",\"name\":\"Elea Data Centers\",\"description\":\"Plataforma de Data Centers Sustent\u00e1veis\",\"publisher\":{\"@id\":\"\\\/#organization\"},\"alternateName\":\"Elea\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"\\\/#organization\",\"name\":\"Elea Data Centers\",\"alternateName\":\"Elea\",\"url\":\"\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/elea-logo.png\",\"contentUrl\":\"https:\\\/\\\/eleadatacenters.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/elea-logo.png\",\"width\":211,\"height\":76,\"caption\":\"Elea Data Centers\"},\"image\":{\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/eleadatacenters\\\/\"]},{\"@type\":\"Person\",\"@id\":\"\\\/#\\\/schema\\\/person\\\/62eb708a6729476fb3473b8d4cfdcedf\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"http:\\\/\\\/localhost\\\/elea-wp\"],\"url\":\"https:\\\/\\\/eleadatacenters.com\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea","description":"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/","og_locale":"en_US","og_type":"article","og_title":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea","og_description":"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.","og_url":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/","og_site_name":"Elea","article_published_time":"2024-07-16T15:49:50+00:00","article_modified_time":"2024-10-18T20:13:20+00:00","og_image":[{"width":768,"height":512,"url":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#article","isPartOf":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/"},"author":{"name":"admin","@id":"\/#\/schema\/person\/62eb708a6729476fb3473b8d4cfdcedf"},"headline":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area","datePublished":"2024-07-16T15:49:50+00:00","dateModified":"2024-10-18T20:13:20+00:00","mainEntityOfPage":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/"},"wordCount":575,"commentCount":0,"publisher":{"@id":"\/#organization"},"image":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#primaryimage"},"thumbnailUrl":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png","articleSection":["Press Releases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/","url":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/","name":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area - Elea","isPartOf":{"@id":"\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#primaryimage"},"image":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#primaryimage"},"thumbnailUrl":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png","datePublished":"2024-07-16T15:49:50+00:00","dateModified":"2024-10-18T20:13:20+00:00","description":"The strategic investment enhances the S\u00e3o Paulo Metro area\u2019s capacity to deploy Artificial Intelligence and Cloud Technology.","breadcrumb":{"@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#primaryimage","url":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png","contentUrl":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/IMAGEM-PARA-BLOG-1-768x512-1.png","width":768,"height":512},{"@type":"BreadcrumbList","@id":"https:\/\/eleadatacenters.com\/en\/2024\/07\/16\/elea-digital-data-centers-announces-120mw-footprint-expansion-in-the-greater-sao-paulo-area\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/eleadatacenters.com\/en\/"},{"@type":"ListItem","position":2,"name":"Elea Digital Data Centers Announces 120MW Footprint Expansion in the Greater S\u00e3o Paulo Area"}]},{"@type":"WebSite","@id":"\/#website","url":"\/","name":"Elea Data Centers","description":"Plataforma de Data Centers Sustent\u00e1veis","publisher":{"@id":"\/#organization"},"alternateName":"Elea","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"\/#organization","name":"Elea Data Centers","alternateName":"Elea","url":"\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"\/#\/schema\/logo\/image\/","url":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/elea-logo.png","contentUrl":"https:\/\/eleadatacenters.com\/wp-content\/uploads\/2024\/09\/elea-logo.png","width":211,"height":76,"caption":"Elea Data Centers"},"image":{"@id":"\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/eleadatacenters\/"]},{"@type":"Person","@id":"\/#\/schema\/person\/62eb708a6729476fb3473b8d4cfdcedf","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4e9f0c59135e8eca8e263d07c8279e2f82f346c40dd26cad6b5afa71c32f0ddb?s=96&d=mm&r=g","caption":"admin"},"sameAs":["http:\/\/localhost\/elea-wp"],"url":"https:\/\/eleadatacenters.com\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/posts\/4583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/comments?post=4583"}],"version-history":[{"count":3,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/posts\/4583\/revisions"}],"predecessor-version":[{"id":4970,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/posts\/4583\/revisions\/4970"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/media\/4584"}],"wp:attachment":[{"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/media?parent=4583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/categories?post=4583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eleadatacenters.com\/en\/wp-json\/wp\/v2\/tags?post=4583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}